- Construction of Sahil Solar Power Plant (SPP) was completed on August 28, 2018.
- The station is located in Sahil settlement of Garadagh district, in the general area on the right and left side of the bridge.
- The project capacity of the station is 2.8 MW. In 2018, 1.44 MW of power was put into operation in the first stage of the construction of the station. From the date of commissioning to January 1, 2022, 4.9 million kWh of electricity was generated.