AREA

Font size

Font type

San-SerifSerif

Image visibility

Visibility

Other projects

Construction and installation works of 36 MW Ordubad Hydroelectric Power Plant of derivation type on the Aras River in the territory of Ordubad region of Nakhchivan AR and 15.6 MW Tivi Hydroelectric Power Plant are underway, at the same time, measuring devices were installed in Ordubad region for feasibility study of future operation of wind turbines and necessary measurements are being carried out, as well as site selection and power plant design for the installation of new wind turbines in Julfa.